Seco Tools

PPP Cost Studio

Strategic accounts · Steven's toolset

Prototype · dummy data

Master calculator — Op 671-002 · OP60

Price-per-part economics against measured cycle and tool life.

Cycle time

144.6 min

46 tools · 1 component/cycle

Annual value

$11,640,000

2,400,000 components × 4.85

±$0.01 price swing

$24,000

Yearly exposure per cent mispriced

Ship-set variance

+2 / month

+5.0% vs machine consumption

Inputs

Variance = ship-sets sent per month against the consumption of the machine. Over-consumption flags a tool eating more life than the model assumes.

Over-consumption per tool — top drivers

ToolOpsCut time (min)% of cycleExpectedActualVariance
6480119.05
13.2%
17.419.05+1.65m
20031018.87
13.0%
14.218.87+4.67m
6792112.93
8.9%
12.112.93+0.83m
9708110.67
7.4%
11.010.67-0.33m
0007110.50
7.3%
9.310.50+1.20m
539019.18
6.3%
9.49.18-0.22m
1120818.48
5.9%
7.18.48+1.38m
465618.40
5.8%
8.68.40-0.20m

Restricted to the A-team — not visible on Class A account portals. 38 further tools collapsed.